1

BIM dimensions: example of air blower station at wastewater treatment plant

wydcnfplut8s
The main goal of research is to analyse the prospects for the development of BIM dimensions (3D-7D) in Russia on the example of Water and wastewater industry (WWI) asset. Justification of goal is the insufficient development of industry-specific BIM systems. allowing for different interpretations of its dimensions. The object of research is the air blower station (ABS). https://megavitamines.shop/product-category/slippery-elm/
Report this page

Comments

    HTML is allowed

Who Upvoted this Story